Description
6-24V Automotive Test Probe – Powerhand
Great for testing for bad earths, breaks in continuity, short circuits
Powers up relays & components (solenoids, motors, light clusters etc) to help trace faults
Built in 8 amp thermal trip, even if a circuit isn’t what you thought and the unit trips, after a few seconds the probe is ready to go again.
Easy to read red / green LED indicator for positive & negative
Long earth ‘fly’ lead for easy connection
5m long leads for excellent reach / access
Rocker switch allows switching to positive / negative feed as required





